Background & Client Challenge

Carbery identified a requirement to increase wastewater storage capacity and improve operational resilience ahead of its Wastewater Treatment Plant. The new Dairy Sump Facility was designed to provide additional buffering capacity during abnormal process conditions while improving environmental protection and operational visibility.

What We Did

DOR Group delivered the complete electrical and control systems package for the new facility. Works included distribution upgrades, MCC modifications, VSD-controlled pumping systems, instrumentation integration, containment installation, process control infrastructure and commissioning support. The project required close coordination with civil, mechanical and process contractors while maintaining continuity across critical manufacturing operations.

Results Delivered

  • Increased wastewater storage capacity
  • Improved environmental protection and compliance
  • Enhanced operational visibility through monitoring and alarms
  • Reduced risk of WWTP overload events
  • Energy-efficient pumping through VSD technology
  • Future-proofed infrastructure supporting ongoing site expansion

Project Highlights

  • Electrical Infrastructure Upgrades
  • MCC Modifications
  • VSD Pumping Systems
  • Instrumentation & Automation
  • Process Control Integration
  • Industrial Project Delivery
"DOR Group delivered a complex project safely and professionally while coordinating effectively with multiple stakeholders across the site."

Planning an electrical project?

Talk to the DOR team about your operation, objectives and operational constraints. 

We’ll take the time to understand your requirements before designing a safe, practical and cost-effective solution.